Job Gulf – Gulf Jobs in Dubai, Middle East & North America

Damir Baispayev

Project management specialist

With nearly 20 years in O&G and Energy sectors and Civil construction experience, I have several completed commissioning projects (mid-size) behind my back.

Other areas of expertise include Instrumentation and Control, Automation systems design and commissioning. Gas turbine commissioning and technical support management.

Continuous education thru job-related challenges and broadening the skillset are my drivers. I see myself in Project management role in areas mentioned above as well as in Aviation, Renewables, environmentally-friendly Waste recycling.

Category
UAE
E-mail
Locked
Phone Number
Locked
Website

Education

MBA @ Internation university of Kyrgyzstan
Sep 2016 — Current
Major in International business.
Systems engineer @ Taraz State University
Sep 1995 — Jun 2000
Majored in Industrial Process automation.

Experience

Founder/Practicing Project manager @ DB engineering LLP, Astana, Kazakshtan
Jan 2016 — Current
DB engineering was established at the end of 2015 as a private entity providing technical scope services to various customers in Kazakhstan. The scope of completed projects to date includes EPC services for one of the major medical institution (President's Hospital, Astana, 90,000 sq.m) in supplying and commissioning a nurse call system by Ackermann, Germany, start-up of the LED street luminaires production factory in Karaganda for Ecolampa LLP.
Current projects include process controls and instrumentation design projects in O&G sector in partnership with SazanEng and West group engineering companies in Atyrau, Western Kazakhstan.
As a Project manager I'm fulfilling SCM, EPC roles, providing consulting and managing services, actively involved in design and commissioning activities along with the team of 10 technical specialists.
Construction supervisor @ Southfork Ltd, Astana, Kazakhstan
Jul 2014 — Dec 2015
Supervised on-site execution of low-current systems construction, commissioning and start-up scope of work for the Administration of presidential affairs at President’s Hospital construction site. This comprised of resolving logistical issues, managing warehouse (1.5M USD worth of equipment) stock, personnel management (headcount of 25 technicians and engineers, vendors and service providers), finding technical solutions and workarounds, implementing ad-hoc modifications.
Personal contribution includes finding practical engineering solutions within allocated budget resources and timeframe, total savings 0.5M USD.
Systems comprised of structured cable network (Cisco network), building management systems (controls and fire protection) by Siemens, CCTV by Microdigital and HP, PA, access control by Siemens, hospitality TV by PWV, nurse call system by Ackermann.
Single-handedly completed systems handover to the Customer and project closure.
Technical support engineer @ Rolls-Royce Energy MECA, Almaty branch, Kazakhstan
Oct 2013 — Jun 2014
Held the duties of front line technical support both in the office and on sites for two major Customers in Kazakhstan - Agip and Asian Gas pipeline. Combined fleet count - 16 Gas compressor and Power generation units. Resolved issues in both controls and mechanical scope of work eventually contributing to new order intake. Executed Root cause failure analysis, increased machinery Reliability and Availability numbers thus contributing to higher contractual income. Developed and maintained the problem resolution tracking system, provided guidance to the Customer with contingency stock planning. Developed and headed execution of a yearly maintenance plan for the fleet. Provided guidance and mentorship to a team of field service engineers.
Installation and Commissioning manager @ Rolls-Royce Energy MECA, Almaty branch, Kazakhstan
Apr 2011 — Oct 2013
Managed the Installation and Commissioning scope of work on four Power generation Turbine packages for Agip KCO's North Caspian Kashagan project. Initiated and completed a retrofit campaign after long-term preservation of the equipment. Total savings is 2M USD on materials procurement and timely project completion. Completed the equipment handover having reached project deliverables within allocated budget. Oversaw the work of a team of 10 engineers and vendors.
Operations Team Leader @ Rolls-Royce Energy MECA, Baku branch, Azerbaijan
Dec 2010 — Jan 2012
Managed daily operations across three platforms (14 gas turbine units – power generation, water injection pumps, gas compressors) for BP’s offshore Caspian operations. Conducted on-site failure investigations, Root cause failure analysis, implemented several rectification programs fleet-wide, worked closely with third-party vendors and internal Tech.support service.
Planned and executed maintenance activities, overhauls, maintained contractual KPIs at top levels, provided daily reporting to the Customer.
Senior safety systems engineer @ Agip KCO, Atyrau, Kazakhstan
Aug 2009 — Nov 2010
Acceptance and Commissioning of Triconex F&G and ESD PLC systems (supplied by Invensys) at Karabatan Onshore gas processing facility construction site.
Daily coordination of commissioning activities of subject systems which included but not limited to: loop checks, modification and update of logic applications, maintenance and upgrade of PLCs, peer-to-peer network setup (modbus, fibre optics). Conducting Site Acceptance Tests and managing handover to Operations.
ICS Safety systems engineer @ Tengizchevroil, Atyrau, Kazakhstan
Aug 2008 — Jan 2009
Interim position, as part of Customer Care program had been seconded by ICS Triplex to support the Customer (TCO) at initial operational stage at a newly commissioned plant facility (Second generation plant/Sour gas injection). Maintaining daily operations of F&G and ESD PLC network, implementing software modifications and hardware replacement.
Lead commissioning engineer @ ICS Triplex EMEA plc, Essex, UK
Sep 2005 — Jul 2008
Took on a site commissioning phase managing role heading a team of 10 expat engineers and installed, commissioned and started a network of 19 safety system PLC multi-frame panels at Tengizchevroil’s newly built Second Generation/Sour gas injection facility, Western Kazakshtan. Successfully handed the systems over to the Customer.
Systems engineer @ ICS Triplex EMEA plc, Essex, UK
Apr 2004 — Apr 2006
Joined a project team involved in design and assembly of the Safety systems architecture for Tengizchevroil’s new facility at Western Kazakhstan. Have been actively involved in all stages of in-house design stage – hardware/software validation, testing, logic programming, fault finding, developing and translating project drawings and manuals. Conducted factory acceptance and integration testing with Customer representatives.
Instrumentation and Controls reliability engineer @ Tengizchevroil, Atyrau, Kazakhstan
Jun 2000 — Jan 2004
Early career start at TCO’s gas processing plant (Tengiz oil field). Duties included engineering support in every day plant operation/maintenance, preparation of job packs for instruments replacement/installation (preparation of drawings, working with suppliers, updating logic diagrams), placement of material orders.
Trilingual interpreter/translator @ Tengizchevroil, Atyrau, Kazakhstan
May 1999 — Jun 2000
Oral/written translations of meetings and technical documentation for the Electrical and Instrumentation reliability group, part of Plant Operations division at TCO's gas processing facility (Tengiz oil field, Western Kazakhstan).

Contact Candidate

Login or purchase this resume contact details.
Purchase